首页> 美国政府科技报告 >Enhancing TSM&O Strategies through Life Cycle Benefit/Cost Analysis Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems.
【24h】

Enhancing TSM&O Strategies through Life Cycle Benefit/Cost Analysis Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems Life Cycle Benefit/Cost Analysis & Life Cycle Assessment of Adaptive Traffic Control Systems and Ramp Metering Systems.

机译:通过生命周期效益/成本分析增强Tsm和O战略生命周期效益/成本分析&自适应交通控制系统和斜坡计量系统的生命周期评估生命周期效益/成本分析&自适应交通控制系统和斜坡计量系统的生命周期评估生命周期效益/成本分析&自适应交通控制系统和斜坡计量系统的生命周期评估。

获取原文

摘要

The research team developed a comprehensive Benefit/Cost (B/C) analysis framework to evaluate existing and anticipated intelligent transportation system (ITS) strategies, particularly, adaptive traffic control systems and ramp metering systems, in terms of the triple bottom line (TBL) of sustainability (i.e. social, economic, and environmental impacts). The B/C framework for each ITS category was divided into four main areas: Life Cycle Cost Analysis, Analysis of Benefits through Travel Time Savings, Analysis of Benefits through Reductions in Energy Consumption, and Analysis of Benefits through Safety Enhancements. The life cycle cost analysis of an ITS deployment includes infrastructure costs, incremental costs, and O&M costs. The analysis of benefits through travel time savings was grouped into recurring travel time savings analysis and nonrecurring travel time savings analysis. The analysis of benefits through reductions in energy consumption was conducted using a newly-built microscopic scale top-down approach. Analysis of benefits through safety enhancements was mainly focused on fatal crashes. According to the results, the Benefit/Cost ratio (BCR) for a typical ATCS deployment may range between 6.52 and 13.04; whereas the BCR for a typical ramp metering deployment is expected to be around 6.44. We consider the results obtained from our B/C framework as conservative, which means that BCRs calculated in our study can be lower than specific ATCS and ramp metering deployments around the United States.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号