首页> 外国专利> METHODS OF PIPELINE CONSTRUCTION IN ARCTIC AND SUBARCTIC REGIONS AND APPARATUS FOR CARRYING OUT SAME

METHODS OF PIPELINE CONSTRUCTION IN ARCTIC AND SUBARCTIC REGIONS AND APPARATUS FOR CARRYING OUT SAME

机译:北极和亚北极地区的管道建设方法以及实施该方法的设备

摘要

METHODS OF PIPELINE CONSTRUCTION IN ARCTICAND SUBARCTIC REGIONS AND APPARATUS FORCARRYING OUT THE SAMEAbstract of the DisclosureMethods of pipeline construction in arctic andsubarctic regions and apparatus for carrying out these methodsare disclosed. Summer-constructed fabrication yards areestablished at central locations along the pipeline right-of-way spaced at intervals of 100 to 150 miles each comprisinga group of buildings utilized to fabricate instrument , andhermetically cap pipe sections, including quality control,x-ray, hydrostatic testing, external coating, final inspection,and rivet coating and weighting, along with facilities formoving pipe sections from place to place during fabrication,inspection, coating, etc. After fabrication, the pipe sectionsare stored in a marshalling yard located near the end of thefabrication yard nearest the half-division in which it willbe installed. In winter each pipe section is towed to itsplace of installation over a working snow pad or snow roadfollowing the pipeline right-of-way, for instance, by a pairof large tow tractors operating in tandem. Sensors or sensinginstruments mounted on or in the pipe section during fabricationare cabled to indicating instruments in the lead tow tractor,to assure that while in transit the pipe section undergoes nobend less than its permissible roped radius of curvature.The forward end of the pipe section being towed is mountedon a nose sled bearing a compressor and air heater for thepurpose of maintaining an elevated temperature inside thehermetically sealed pipe section. To prevent "slideouts" orthe like, portions of the pipe may be mounted on special"pipe sleds" provided with a lifting means which enable asideboom tractor to raise a portion of the pipe section orimpart a pull to assist in preventing sideslipping. Whena pipe section is being moved, a number of sideboom tractorsaccompany the pipe section, guiding respective portions ofit in special roller cradles equipped with remotely controlledpipe-gripping means or brakes.
机译:北极管道施工方法和亚热带地区和装置贯彻始终披露摘要北极和北极地区的管道施工方法北极地区和实施这些方法的设备被披露。夏季建造的堆场是建立在管道权利权的中央位置间隔100至150英里的方式,每个包括用于制造仪器的一组建筑,和密封管段,包括质量控制,X射线,静水压测试,外部涂层,最终检查,和铆钉涂层和配重,以及用于在制造过程中将管段从一个地方移到另一个地方,检查,涂层等。制造后,管段存放在靠近尾部的编组场最接近其一半分区的制造场被安装。在冬季,每个管段都被拖到安装地点在可以使用的雪垫或雪道上沿管道通行权,例如,一对串联运行的大型牵引车。传感器或感应在制造过程中安装在管道部分上或内部的仪器电缆连接到牵引拖车中的指示仪器,以确保在运输过程中管段不会弯曲小于其允许的绳索曲率半径。被牵引的管段的前端已安装机头雪橇上装有压缩机和空气加热器,用于维持内部温度升高的目的密封管段。为了防止“滑出”或诸如此类,管道的某些部分可以安装在特殊的“雪橇”设有提升装置,可以使侧杆牵引车以升高部分管道或施加拉力以帮助防止侧滑。什么时候管段正在移动,许多侧臂牵引车随管段一起引导在配有遥控功能的专用滚轮架中管道夹紧装置或制动器。

著录项

  • 公开/公告号CA1096645A

    专利类型

  • 公开/公告日1981-03-03

    原文格式PDF

  • 申请/专利权人 GIBSON MURRAY;

    申请/专利号CA19780306707

  • 发明设计人 GIBSON MURRAY;

    申请日1978-07-04

  • 分类号F16L1/02;B23K9/00;

  • 国家 CA

  • 入库时间 2022-08-22 15:46:21

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号