首页> 外国专利> Energy/load management in on-board electrical system involves determining available peak power before load switch-on, delaying switch-on if insufficient power, increasing power and/or reducing load

Energy/load management in on-board electrical system involves determining available peak power before load switch-on, delaying switch-on if insufficient power, increasing power and/or reducing load

机译:车载电气系统中的能量/负载管理涉及在负载接通之前确定可用的峰值功率,如果功率不足则延迟接通,增加功率和/或减少负载

摘要

The method involves supplying a peak power level to the loads in a first phase and rated power in a second phase after switch-on. A controller (14) determines the available peak power before the load (8) is switched on, switch on time is delayed if there is insufficient peak or rated power available, power increasing and/or load reducing measures are carried out and the new load is only switched on if sufficient rated and peak power is available. AN Independent claim is also included for the following: (a) an -board electrical system, especially for a motor vehicle.
机译:该方法包括在接通之后向第一阶段的负载提供峰值功率水平,并向第二阶段的负载提供峰值功率水平。控制器(14)在接通负载(8)之前确定可用的峰值功率,如果没有足够的峰值或额定功率可用,则延迟接通时间,执行功率增加和/或减少负载的措施,以及新的负载仅在有足够的额定功率和峰值功率时才打开。还包括以下方面的独立权利要求:(a)车载电气系统,尤其是机动车辆。

著录项

  • 公开/公告号DE10232539A1

    专利类型

  • 公开/公告日2004-02-05

    原文格式PDF

  • 申请/专利权人 ROBERT BOSCH GMBH;

    申请/专利号DE20021032539

  • 发明设计人 LUZ OLIVER;RIEGER REINHARD;FINK HOLGER;

    申请日2002-07-18

  • 分类号H02J1/00;B60R16/04;

  • 国家 DE

  • 入库时间 2022-08-21 22:44:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号