A METHOD AND SYSTEM FOR CONSTRAINT-BASED PROJECT SCHEDULING

机译:一种基于约束的项目调度方法和系统

摘要

A method and system of constraint-based project scheduling. The method comprisesmaintaining a first database containing project scheduling data associatedwith at least a current period and a next period of an assignment plan; maintaininga second database containing data associated with a look ahead plan, the lookahead plan covering at least an overlap portion of the next period of the assignmentplan such that the look ahead plan overlaps the assignment plan; transferringdata associated with one or more shielded tasks having a starting time withinthe overlap portion of the next period from the second database into the firstdatabase as a modification of the project scheduling data associated with thenext period of the assignment plan; and executing the project according to thenext period of the assignment plan based on the modified project scheduling dataassociated with the next period in the first database.
机译:一种基于约束的项目调度方法和系统。该方法包括维护包含相关项目计划数据的第一个数据库至少有一个分配计划的当前时期和下一时期;维持第二个数据库包含与前瞻计划相关的数据预先计划至少涵盖下一个作业期的重叠部分计划,以使前瞻性计划与分配计划重叠;转移与一个或多个屏蔽任务相关的数据,其起始时间在从第二个数据库到第一个数据库的下一个期间的重叠部分数据库作为与项目关联的项目计划数据的修改作业计划的下一个阶段;并根据基于修改后的项目进度数据的分配计划的下一个阶段与第一个数据库中的下一个期间相关联。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号