PILOT TUNNEL EXCAVATION, AN ENLARGED BLAST, A TUNNEL EXCAVATION WITH A LINING CONSTRUCTION METHOD USING A TBM, AND A DEVICE THEREOF

机译:先导隧道开挖,扩大的爆破,采用TBM的衬砌施工法进行隧道开挖及其装置

摘要

PURPOSE: A pilot tunnel excavation, an enlarged blast, a tunnel excavation with a lining construction method using a TBM, and a device thereof are provided to reduce the construction time and cost by reducing the required equipment.;CONSTITUTION: A pilot tunnel excavation, an enlarged blast, a tunnel excavation with a lining construction method using a TBM is as follows. The bottom of the TBM is located on the bottom of a pilot tunnel, and the pilot tunnel is excavated. An inclined blast hole is beforehand drilled toward a radius of the tunnel except a part in which a TBM conveyor belt is passed during excavating of the pilot tunnel. A longitudinal blast hole is drilled to the outermost surface of the pilot tunnel and the part in which the TBM conveyor belt is passed. An inclined/longitudinal enlarged blasting is firstly performed in the top surface of the pilot tunnel, and at the same time, a longitudinal blasting is secondly performed in the bottom surface of the pilot tunnel.;COPYRIGHT KIPO 2010
机译:目的:提供一种试验隧道开挖,爆破,使用TBM的衬砌施工方法进行隧道开挖及其装置,以通过减少所需设备来减少施工时间和成本。对于大爆炸,使用TBM的衬砌施工方法进行的隧道开挖如下。 TBM的底部位于引燃通道的底部,并开挖了引燃通道。预先朝着隧道的半径钻一个倾斜的爆破孔,除了在引燃隧道的挖掘过程中使TBM传送带通过的部分。在引燃通道和TBM传送带通过的部分的最外表面钻一个纵向喷孔。首先在引燃隧道的顶面进行倾斜/纵向爆破,然后在引燃隧道的底面进行纵向爆破。; COPYRIGHT KIPO 2010

著录项

  • 公开/公告号KR20100003061A

    专利类型

  • 公开/公告日2010-01-07

    原文格式PDF

  • 申请/专利权人 LTM. CORP.;

    申请/专利号KR20080063161

  • 发明设计人 LEE CHAN WOO;

    申请日2008-06-30

  • 分类号E21D9/00;E21D11/00;

  • 国家 KR

  • 入库时间 2022-08-21 18:33:34