FIELD: construction.;SUBSTANCE: invention is related to hydrotechnical construction, namely to technology for installation of motor road tunnel or tunnel of other purpose under riverbed or under bottom of another shallow water area. Method for erection of shallow subway at water area bottom includes using single facility without bottom part with controlled floatability, delivery of this facility to track of tunnel arrangement, positioning and fixation in area selected on it with the help of fixtures, leveling along horizon, arrangement of section closed in plant at water area bottom by means of its space fencing initially with the help of caissons and then rabbets, excavation of bottom soil from it with creation of bearing tunnel bed with installation of assembled or monolithic sections of tunnel on it. After works have been completed inside fenced space, including ballasting of section with soil, its fencing is dismantled, and single facility without bottom part with controlled floatability is displaced to the next place in track of tunnel erection, and cycle is repeated. Single facility without bottom part with controlled floatability is represented by self-lifting floating barge (SFB) with down portion in the middle, at which fixtures are represented with even number of at least four submersible supports, which provide, when required, lifting of SFB at height that eliminates effect of wave loads at SFB body, guides (T-bars) arranged vertically along inner walls of down portion with the possibility of submersion into soil, and caissons arranged with the possibility of interaction with guides by means of displacement along them in process of submersion and lift of each caisson with the help of crane equipment included into SFB, and also rabbet arranged on SFB and with the possibility of its submersion at inner side of caissons. Withdrawal of SFB to selected area in track of tunnel erection is carried out by self-travelling and/or with the help of towboats. Positioning and fixation of SFB above specified place in water area is carried out with the help of lowered supports, which are used to set height of SFB over level of water area providing for required clearance in case of maximum increase of water level and possible height of waves. Erection of section closed in plan at water area bottom by means of its space fencing and erection of wall above it, which is produced from caissons alternately submerging them one onto another along guides, which are arranged along inner walls of SFB down portion and tightly connecting them to each other. Lower edge of initially submerged caisson is submerged in bottom of water area at the depth that corresponds to upper surface of tunnel section arranged at the bottom of water area in place of SFB position fixation, then inside this well a rabbet is deepened into bottom soil by value that exceeds height of tunnel section. Border of soil excavation is formed, after excavation of soil from space fenced by rabbet, section of tunnel is placed on it, after that space between section and rabbet is filled with sand, frame is mounted on section and filled with ballasting material, and only then SFB is dismantled and SFB is transferred to new place of tunnel erection.;EFFECT: reduced time for tunnel erection, reduced labour intensiveness, increased reliability of tunnel arrangement.;4 dwg
机译:技术领域本发明涉及水力建筑,即涉及在河床下方或在另一个浅水区底部下方安装公路隧道或其他目的的隧道的技术。在水域底部建造浅层地铁的方法包括:使用不带底部的单一设施,并具有可控制的可漂浮性;将该设施交付到隧道布置的轨道;借助于固定装置,在选定的区域内进行定位和固定;沿地平线进行平整;布置首先通过沉箱,然后通过槽齿的空间围栏,在水域底部封闭植物的一部分,从中挖掘底部土壤,并创建承重隧道床,并在其上安装组装的或整体的隧道段。在围栏空间内完成工程(包括用土对部分进行压载)后,将其围墙拆除,将没有底部可控制浮动性的单个设施移至隧道竖井的下一个位置,并重复进行循环。不带底部且可控制浮动性的单个设施由中部下部的自升式浮船(SFB)表示,在该处,固定装置用至少四个偶数个潜水支架表示,这些支架在需要时提供SFB的提升在高度上消除了SFB主体上的波浪载荷的影响,沿下部内壁垂直布置的导向器(T型杆)可能会浸入土壤中,而沉箱可能通过沿其位移的方式与导向器相互作用在SFB中包括的起重机设备的帮助下,每个沉箱的沉没和提升过程中,还有在SFB上布置的槽口,并可能将其沉没在沉箱的内侧。通过自驾游和/或在拖船的帮助下,将SFB撤出至沿隧道安装方向行驶的选定区域。在降低的支撑的帮助下,将SFB定位和固定在水区域中的指定位置上方,该支撑用于将SFB的高度设置在水区域的水平面之上,以在最大水位增加和最大可能高度的情况下提供所需的间隙。波浪。通过其空间围栏在水域底部平面封闭的部分的安装和在其上方的墙壁的安装,这是由沉箱沿导向器交替地将它们沉入另一个而产生的,这些引导器沿着SFB下部的内壁排列并紧密连接他们彼此。最初沉入的沉箱的下边缘被淹没在水区域的底部,深度对应于设置在水区域底部的隧道断面的上表面,代替了SFB位置固定,然后在该井中,通过以下方式将一个槽口深化到底部土壤中:超过隧道断面高度的值。形成土壤开挖的边界,在由刨刀围成的空间中挖土后,在其上放置一段隧道,在刨刀和刨刀之间的空间中填满沙子,将框架安装在该部分上并填充压载材料,仅效果:减少了隧道安装的时间,减少了劳动强度,增加了隧道布置的可靠性。4dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号