Generator operation plan determination device, generator operation plan determination method and generator operational planning decision program

机译:发电机运行计划确定装置,发电机运行计划确定方法和发电机运行计划决策程序

摘要

PROBLEM TO BE SOLVED: To make a starting plan of a plurality of generators satisfying a demand forecast of power and various kinds of restrictions suitably and at low processing load.;SOLUTION: The demand forecast is obtained and an initial plan is obtained that contains an initial value of a starting state value of each of the generators determined according to a time-series demand forecast. Based on the initial plan, a generator subject to correction of the starting state value is determined. Based on a power generation cost formula including the starting state value of each of the generators, a starting state value of each generator is obtained so that the demand forecast can be satisfied and a calculated cost becomes the minimum. In that case, the calculation is made by changing a coefficient of the power generation cost formula so as to make it easy for the starting state values of subject generators to converge on 0 and for the starting state values of non-subject generators, which are generators other than the subject generators, converge on 1. When the starting state values of the subject generators are calculated as values other than 0, it is treated as 1.;COPYRIGHT: (C)2011,JPO&INPIT
机译:要解决的问题:为多个发电机制定启动计划,以使其在较低的处理负荷下适当地满足功率和各种限制的需求预测;解决方案:获得需求预测,并获得包含以下内容的初始计划:根据时序需求预测确定的每个发电机的初始状态值的初始值。基于初始计划,确定要对初始状态值进行校正的发电机。基于包括每个发电机的起始状态值的发电成本公式,获得每个发电机的起始状态值,使得可以满足需求预测并且所计算的成本变为最小。在那种情况下,通过改变发电成本公式的系数来进行计算,以使得主体发电机的初始状态值易于收敛于0以及非主体发电机的初始状态值易于收敛于0。除主题生成器以外的其他生成器收敛于1。当主题生成器的起始状态值计算为非0的值时,将其视为1。版权所有:(C)2011,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号