首页> 外国专利> PREVENTING AND CONTROLLING METHOD FOR MAIN RIVER TRANSPORT CONTROLLING DEBRIS FLOW

PREVENTING AND CONTROLLING METHOD FOR MAIN RIVER TRANSPORT CONTROLLING DEBRIS FLOW

机译:主河运输控制泥石流的防治方法

摘要

A preventing and controlling method for main river transport controlling debris flow includes: first, according to the transport ability of the main river, a drainage project is used to prevent and control the debris flow. Then, based on the drainage project, if any debris flow matters can't be transported to the lower reach by the main river, a drainage project and a block project will be used at the same time to prevent and control the debris flow. Furthermore, based on the drainage project and the block project, if any debris flow matters still can't be consumed completely, a drainage project, a block project and a deposit project will be combined together to prevent and control the debris flow. Dredge is considered as a primary means in the method. The transport ability of the main river is used sufficiently and debris flow matters are distributed reasonably along the path. A preventing and controlling system is then arranged reasonably. Safe drainage of debris flow can be achieved and barrier lake, a secondary disaster, formed by blocking the main river which is caused by draining debris flow overly can be avoided by the method. The safety of towns in mountain areas, important projects and infrastructures positioned at the debris flow gully mouth can be ensured.
机译:一种主要河流交通控制泥石流的防治方法,包括:首先,根据主要河流的运输能力,采用排水工程防治泥石流。然后,在排水工程的基础上,如果任何泥石流物质都不能由主河运输到下游,则将同时使用排水工程和街区工程,以防止和控制泥石流。此外,在排水工程和砌块工程的基础上,如果仍然无法完全消耗掉泥石流,则将排水工程,砌块工程和沉淀工程结合在一起,以防止和控制泥石流。挖泥被认为是该方法的主要手段。主要河流的运输能力得到充分利用,泥石流物质沿路径合理分布。然后合理地布置了一个预防和控制系统。该方法可以实现泥石流的安全排泄,可以避免因过多排出泥石流而阻塞主河而形成的堰塞湖,即次生灾害。可以确保山区城镇,重要项目和位于泥石流沟口的基础设施的安全。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号