首页> 外国专利> GENERATING MULTIPLE OPTIMAL DAILY SCHEDULES FOR MULTIPLE TIME PERIODS IN A DAY AND FOR MULTIPLE DAILY PATTERNS

GENERATING MULTIPLE OPTIMAL DAILY SCHEDULES FOR MULTIPLE TIME PERIODS IN A DAY AND FOR MULTIPLE DAILY PATTERNS

机译:为一天中的多个时间段和多个每日模式生成多个最佳每日计划

摘要

A computer and method use at least an index of a last item in a new partial schedule and an ending time of the last item to identify a set of one or more stored partial schedules. The computer and method determine whether the new partial schedule dominates any stored partial schedule in the set, based on comparison of at least new lower bound(s) and new upper bound(s) on attribute(s) of a complete schedule that comprises the new partial schedule, with corresponding lower bound and upper bound of each complete schedule to be built using each stored partial schedule. Any stored partial schedule in the set is removed, when the new partial schedule is determined to dominate said any stored partial schedule. When no stored partial schedule in the set dominates the new partial schedule, the new partial schedule is added to the set, followed by repeating the process.
机译:一种计算机和方法,其至少使用新的部分时间表中的最后一项的索引以及该最后项目的结束时间来识别一组一个或多个存储的部分时间表。该计算机和方法基于至少一个新的下界和新的上界在包含该内容的完整日程表的属性上的比较,来确定新的部分时间表是否在集合中的任何存储的部分时间表中占主导地位。新的部分计划,并使用每个存储的部分计划来构建每个完整计划的相应下限和上限。当确定新的部分时间表主导所述任何存储的部分时间表时,移除集合中的任何存储的部分时间表。如果集合中没有存储的部分时间表主导新的部分时间表,则将新的部分时间表添加到集合中,然后重复该过程。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号