首页> 外国专利> METHOD OF DESIGN HYDROGRAPH FOR RIVER SIDE DETENTION BASIN

METHOD OF DESIGN HYDROGRAPH FOR RIVER SIDE DETENTION BASIN

机译:江边滞留盆地设计水文方法

摘要

The present invention relates to a method to calculate a design hydrograph for a river side detention basin and more specifically, to a method to calculate a design hydrograph for a river side detention basin, capable of suggesting hydrographs of various frequencies indicating equivalent peak flood by separately calculating a design hydrograph for the rainfall of the same frequency and a design flood hydrograph for the equivalent peak flood, and inversely estimating rainfall indicating the peak flood of the same frequency by using the calculated hydrographs.
机译:本发明涉及一种计算河岸滞留盆地设计水位图的方法,更具体地,涉及一种能够通过分别建议表示等效峰值洪水的各种频率的水位图来建议河岸滞留盆地的设计水位图的方法。计算相同频率降雨的设计水位图和等效峰值洪水的设计洪水水位图,并使用计算出的水位图反估计指示相同频率的峰值洪水的降雨量。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号