ABSTRACT The aim of this invention is to present analytically comprehensive scheduling formulations for Repetitive Construction Projects. This research study proposes a new approach to address the issues identified in scheduling repetitive construction projects by setting mathematical scheduling formulations which consider crew work continuity. Mathematical representation of the proposed scheduling approach renders strong analytical capabilities and the ease of computerization. The proposed genetic algorithm-based repetitive project scheduling model (GARPS) strikes an optimal balance between project duration, crew work continuity and project costs, through its multi-objective approach.Following invention is described in detail with the help of Figure 1 of sheet 1 showingthe flowchart for GARPS.
机译:发明内容本发明的目的是提出用于重复建设项目的分析上全面的调度表述。这项研究提出了一种新方法,可以通过设置考虑人员连续性的数学调度公式来解决在重复建设项目的调度中发现的问题。所提出的调度方法的数学表示形式具有强大的分析能力和易于计算机化的能力。所提出的基于遗传算法的重复项目调度模型(GARPS)通过其多目标方法在项目工期,人员工作连续性和项目成本之间达到了最佳平衡。以下第1页的图1对此发明进行了详细描述。显示GARPS的流程图。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号