首页> 外国专利> Sewage treatment plant operation method, operation control device, and sewage treatment plant

Sewage treatment plant operation method, operation control device, and sewage treatment plant

机译:污水处理厂的运行方法,运行控制装置及污水处理厂

摘要

PROBLEM TO BE SOLVED: To provide an operation method of a sewage treatment plant, with which a biological treatment can be performed with excellent energy efficiency and further a microbial flora of activated sludge can be guided to a microbial flora predominantly consisting of soil microorganisms within a short time even when the sewage treatment plant has a BOD/SS load lower than a planned value, and to provide an operation control device and the sewage treatment plant.SOLUTION: In an operation method of a sewage treatment plant including: a storage tank to store sewage; a biological treatment tank to biologically treat the sewage stored in the storage tank; a pump device to supply the sewage from the storage tank to the biological treatment tank; and an aerator to aerate the biological treatment tank, the sewage treatment plant is operated such that a first operational state in which the pump device and the aerator are stopped and a second operational state in which the pump device and the aerator are operated are switched between each other in a day, and when a BOD/SS load of inflow sewage is lower than a predetermined BOD/SS load, a second operation time is set such that biological treatment is performed at the predetermined BOD/SS load.
机译:解决的问题:提供一种污水处理厂的操作方法,利用该方法可以以优异的能源效率进行生物处理,并且还可以将活性污泥的微生物菌群引导到主要由土壤微生物组成的微生物菌群中。即使在污水处理厂的BOD / SS负荷低于计划值时也能在很短的时间内提供操作控制装置和污水处理厂。解决方案:在污水处理厂的运行方法中,包括:储存污水;生物处理池,对储存在储存池中的污水进行生物处理;泵装置,用于将污水从储罐供应到生物处理罐;在对污水处理厂进行操作的状态下,使泵装置和曝气器停止的第一工作状态与泵装置和曝气器的第二工作状态之间进行切换。一天之内彼此接触,并且当流入污水的BOD / SS负荷低于预定的BOD / SS负荷时,设置第二操作时间,以便以预定的BOD / SS负荷进行生物处理。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号