首页> 外国专利> BUILDING CONTROL SYSTEMS WITH OPTIMIZATION OF EQUIPMENT LIFE CYCLE ECONOMIC VALUE WHILE PARTICIPATING IN IBDR AND PBDR PROGRAMS

BUILDING CONTROL SYSTEMS WITH OPTIMIZATION OF EQUIPMENT LIFE CYCLE ECONOMIC VALUE WHILE PARTICIPATING IN IBDR AND PBDR PROGRAMS

机译:参与IBDR和PBDR计划时优化设备寿命周期经济价值的建筑控制系统

摘要

A system for allocating one or more resources including electrical energy across equipment that operate to satisfy a resource demand of a building. The system includes electrical energy storage including one or more batteries configured to store electrical energy purchased from a utility and to discharge the stored electrical energy. The system further includes a controller configured to determine an allocation of the one or more resources by performing an optimization of a value function. The value function includes a monetized cost of capacity loss for the electrical energy storage predicted to result from battery degradation due to a potential allocation of the one or more resources. The controller is further configured to use the allocation of the one or more resources to operate the electrical energy storage.
机译:一种用于跨设备分配一种或多种资源(包括电能)的系统,这些设备进行操作以满足建筑物的资源需求。该系统包括电能存储装置,该电能存储装置包括一个或多个电池,该一个或多个电池被配置为存储从公用事业公司购买的电能并释放所存储的电能。该系统还包括控制器,该控制器被配置为通过执行价值函数的优化来确定一个或多个资源的分配。价值函数包括用于电能存储的容量损失的货币化成本,预计该容量损失的货币化成本是由于一种或多种资源的潜在分配而导致的电池退化所致。控制器还被配置为使用一种或多种资源的分配来操作电能存储。

著录项

  • 公开/公告号US2019195526A1

    专利类型

  • 公开/公告日2019-06-27

    原文格式PDF

  • 申请/专利权人 JOHNSON CONTROLS TECHNOLOGY COMPANY;

    申请/专利号US201916290722

  • 申请日2019-03-01

  • 分类号F24F11/62;F24F5;G05B13/02;F24F11/30;F24F11/46;F24F11/47;F24F11/52;F24F11/58;F24F11/63;F24F11/64;F24F11/77;F24F11/83;G05B19/406;F24F11/84;

  • 国家 US

  • 入库时间 2022-08-21 12:08:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号