首页> 外国专利> BUILDING CONTROL SYSTEM WITH OPTIMIZATION OF EQUIPMENT LIFE CYCLE ECONOMIC VALUE WHILE PARTICIPATING IN IBDR AND PBDR PROGRAMS

BUILDING CONTROL SYSTEM WITH OPTIMIZATION OF EQUIPMENT LIFE CYCLE ECONOMIC VALUE WHILE PARTICIPATING IN IBDR AND PBDR PROGRAMS

机译:参与IBDR和PBDR计划时优化设备寿命周期经济价值的建筑控制系统

摘要

A central plant includes an electrical energy storage subplant configured to store electrical energy, a plurality of generator subplants configured to consume one or more input resources, including discharged electrical energy, and a controller. The controller is configured to determine, for each time step within a time horizon, an optimal allocation of the input resources. The controller is configured to determine optimal allocation of the output resources for each of the subplants in order to optimize a total monetary value of operating the central plant over the time horizon.
机译:中央设备包括配置为存储电能的电能存储子设备,配置为消耗一个或多个输入资源(包括放电的电能)的多个发电机子设备以及控制器。控制器被配置为针对时间范围内的每个时间步确定输入资源的最佳分配。控制器被配置为确定每个子工厂的输出资源的最优分配,以便优化在时间范围内操作中央工厂的总货币价值。

著录项

  • 公开/公告号EP3245707B1

    专利类型

  • 公开/公告日2019-12-04

    原文格式PDF

  • 申请/专利权人 JOHNSON CONTROLS TECHNOLOGY COMPANY;

    申请/专利号EP20160788300

  • 发明设计人 DREES KIRK;WENZEL MICHAEL;TURNEY ROBERT;

    申请日2016-10-07

  • 分类号H02J3/28;H02J3/38;H02J3/32;H02J7/35;H02J3/14;G05B15/02;G06Q50/06;H02J15;H02J3;H02J13;F24F5;G05B13/02;G05B19/406;H02S40/32;F24F11/30;F24F11/62;F24F11/63;F24F11/64;F24F11/58;F24F11/46;

  • 国家 EP

  • 入库时间 2022-08-21 11:40:29

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号