首页> 外国专利> REQUIRED TIME CALCULATION PROGRAM, REQUIRED TIME CALCULATION METHOD AND REQUIRED TIME CALCULATION SYSTEM

REQUIRED TIME CALCULATION PROGRAM, REQUIRED TIME CALCULATION METHOD AND REQUIRED TIME CALCULATION SYSTEM

机译:所需时间计算程序,所需时间计算方法和所需时间计算系统

摘要

To more accurately calculate arrival time of a vehicle.SOLUTION: The computer receives operation plan information and a request to calculate a necessary time up to a destination from an operation management service. The computer refers to the operation plan information and determines whether there is loading or unloading work in a route. When there is the work, the computer determines whether a berth reservation system is present at a berth where the work is performed. When the berth reservation system is present, the computer transmits a request to acquire a predicted required time of the berth to acquire the predicted required time. When there is no berth reservation system, the computer acquires a predicted required time which is registered in advance. The computer refers to the operation plan information and calculates a time of a movement from the starting point to the destination via the berth based upon past actual results. Based upon the predicted required time and the time of movement, the computer outputs a required time from the starting point to the destination.SELECTED DRAWING: Figure 2
机译:为了更准确地计算车辆的到达时间。解决方案:计算机从运行管理服务接收运行计划信息和计算到达目的地的必要时间的请求。计算机参考操作计划信息并确定路线中是否有装卸工作。当有工作时,计算机确定在进行工作的泊位上是否存在泊位预订系统。当存在泊位预订系统时,计算机发送请求以获取泊位的预计所需时间以获取预计所需时间。如果没有泊位预订系统,计算机将获取预先注册的预计所需时间。所述计算机参考所述操作计划信息,并基于过去的实际结果来计算从所述起点经由所述泊位到目的地的移动时间。根据预测的所需时间和移动时间,计算机将输出从起点到目的地的所需时间。图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号