首页> 外国专利> BASIN MODEL FOR RAINFALL RUNOFF VERIFICATION EXPERIMENT

BASIN MODEL FOR RAINFALL RUNOFF VERIFICATION EXPERIMENT

机译:降雨径流验证实验的流域模型

摘要

The present invention relates to a basin model for a rainfall runoff verification experiment, characterized by being a basin construction model having a structure in which a real land miniature is disposed at one side thereof and a developed land miniature is disposed at the adjacent other side thereof. According to the present invention, a rainfall runoff verification experiment is performed by collecting rainfall flowing out to the lower part of the land model through the dropping of artificial rain onto the basin model for the rainfall runoff verification experiment, so as to easily prepare for and measure a change in the amount of rainfall runoff flowing out for a predetermined time from real land, prior to land development, and developed land, thereby enabling easy establishment of a national land use and development plan, and thus disasters caused by the rainfall runoff of land planned to be developed can be prevented in advance during development planning for using national land.
机译:本发明涉及用于降雨径流验证实验的流域模型,其特征在于是一种流域构造模型,其结构中,在其一侧设置有实地模型,而在其另一侧设置有开发后的模型。 。根据本发明,通过将通过将人造雨滴落到用于降雨径流验证实验的流域模型上的土地模型的下部流出的雨水收集来进行降雨径流验证实验,从而容易地准备和在土地开发之前测量从实际土地到开发土地的预定时间内降雨径流量的变化,从而可以轻松地建立国家土地利用和开发计划,从而避免因降雨径流造成的灾害在使用国家土地的开发计划期间,可以预先防止计划开发的土地。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号