首页> 美国政府科技报告 >Development of a full-size divertor cassette prototype for ITER
【24h】

Development of a full-size divertor cassette prototype for ITER

机译:为ITER开发全尺寸偏滤器盒式原型

获取原文

摘要

Production of a full-size divertor cassette involves eight major components. All of the components are mounted on the cassette body. Inner divertor channel components for the vertical target design are being provided by the Japan Home Team. Outer divertor channel components for the vertical target design are being provided by the European and United States Home Teams. Gas box liners are being provided by the Russian Home Team. The full-size components manufactured by the four parties will be shipped to the US Home Team for assembly into a full size divertor cassette. The techniques for assembly and maintenance of the cassette will be demonstrated during this process. The assembled cassette will be tested for proper flow distribution and proof of the filling and draining procedures. The testing will include vacuum leak tightness at full temperature and pressure, cyclic heating to 150 (degrees)C, verification of dimensional accuracy of the assembled components, and application of thermal gradients to measure dimensional stability. The development of the divertor for the International Thermonuclear Experimental Reactor (ITER) depends on successful R&D efforts on materials, joining, and plasma materials interactions. Results of the development program are presented. The scale-up of the processes developed in the basic research and development tasks is accomplished by producing and high-heat-flux testing medium and full-scale mock-ups. The design of the mock-ups is discussed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号