首页> 美国政府科技报告 >A CRITIQUE OF THE COUNCIL ON ECONOMIC PRIORITIES TEXT 'POWER PLANT PERFORMANCE - NUCLEAR AND COAL CAPACITY FACTORS AND ECONOMICS'
【24h】

A CRITIQUE OF THE COUNCIL ON ECONOMIC PRIORITIES TEXT 'POWER PLANT PERFORMANCE - NUCLEAR AND COAL CAPACITY FACTORS AND ECONOMICS'

机译:理事会关于经济优先事项的文章“发电厂绩效 - 核能和煤炭能力因素和经济学”

获取原文

摘要

The Council on Economic Priorities (CEP) has assembled capacity factor data on most U.S. nuclear and coal-fired units in operation, performed a regression analysis upon capacity factor as a function of intrinsic unit variables such as size and age, and attempted a comparison of the economics of typical nuclear and coal-fired units using the resultant fitted capac¬ity factors.1nThis report points out inadequacies in the CEP data base, the lack of predictive value in the results of the regression analysis and inconsistencies in the economic evaluation of nuclear and coal-fired units.

著录项

  • 作者

    Ronald L. Simard;

  • 作者单位
  • 年度 1977
  • 页码 1-48
  • 总页数 48
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号