首页> 美国政府科技报告 >Analysis of Total Acquisition Lead Time for Small Purchase Actions in anOperational Contracting Environment
【24h】

Analysis of Total Acquisition Lead Time for Small Purchase Actions in anOperational Contracting Environment

机译:运营合同环境下小额采购行动的总采购提前期分析

获取原文

摘要

This research was performed for the purpose of determining the factors whichaffect Total Acquisition Lead Time (TALT) for small purchase actions procured in an Operational Contracting Environment. The literature review develops a theoretical model using factors such as socio-economic program, regulatory requirements, alternate means of procurement, buyable purchase requests, customer access to information, funding issues, management information systems, purchase of off-the-shelf items, and accelerated or reduced coordinations. A variety of statistical techniques, including a qualitative regression, Bonferroni Technique, descriptive statistics, and parsing of TALT are used to determine the significance and impact of these factors on TALT. The results of this study indicate that many of these factors, including buyable purchase requests, funding issues, management information system, accelerate or reduced coordinations, and the use of socio-economic programs are significant on TALT. Parsing of TALT is shown so that each step and the corresponding times are shown for each phase in small purchase contracting. A wide sample was used, pulling from 5 different United States Air Force Bases.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号