...
首页> 外文期刊>Panel building and system integration >Checking conducted and radiated emissions prior to full EMC compliance testing
【24h】

Checking conducted and radiated emissions prior to full EMC compliance testing

机译:在进行完整的EMC合规性测试之前检查传导和辐射的发射

获取原文
获取原文并翻译 | 示例
           

摘要

Evaluation must be performed on a production unit, therefore testing typically occurs at the end of the development process. However, if the product fails at this late stage, delays are likely. To reduce the chances of such delays, many companies are including pre-compliance testing of EMI as part of their development process. Although pre-compliance measurements are not a replacement for compliance testing, favorable results are a positive indicator.
机译:评估必须在生产单元上执行,因此测试通常在开发过程结束时进行。但是,如果产品在此后期失败,则可能会延迟。为了减少此类延迟的机会,许多公司将EMI的预一致性测试纳入其开发过程的一部分。尽管合规前的测量不能替代合规性测试,但是良好的结果是一个积极的指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号