首页> 外文期刊>Southwest Contractor >University of Phoenix Stadium
【24h】

University of Phoenix Stadium

机译:凤凰城大学体育馆

获取原文
获取原文并翻译 | 示例
           

摘要

The stadium was built in 36 months and within budget. The innovative project features the first retractable field ever constructed in the U.S. Weighing in at 18.9 million-lbs., the field is able to move in or out of the stadium in about an hour, allowing for a multipurpose space able to host trade shows, concerts and other events. Another first was the largest roof lift in North America. In just a few days, 120 engineers, steel workers and specialized equipment operators lifted the 11.2 million-lb. retractable roof into place.
机译:体育场建于36个月内,且预算不超出预算。该创新项目采用了美国有史以来建造的第一个可伸缩场地,重达1890万磅。该场地能够在大约一个小时内进出体育场,从而提供了一个能够举办贸易展览的多功能空间,音乐会和其他活动。另一个首创是北美最大的屋顶升降机。短短几天内,有120名工程师,钢铁工人和专业设备操作员举起了1,120万磅的重物。可伸缩的屋顶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号