首页> 外文期刊>Southwest Contractor >Super Science/Three New Research Building Materialize on U of A Campus
【24h】

Super Science/Three New Research Building Materialize on U of A Campus

机译:超级科学/三座新研究大楼落成校园

获取原文
获取原文并翻译 | 示例
       

摘要

The University of Arizona in Tucson is going through a major expansion phase of its medical and scientific research facilities. Expansion of the Meinel Optical Sciences Building is nearing completion, as is the Roy P. Drachman Hall, which will provide academic space for the pharmacy, public health and nursing departments. At the same time, three capital improvement projects totaling more than 150 million dollars are poised to provide the school with even more scientific research and laboratory space. The 46.1 million dollars Chemistry Building will be wedged into an extremely tight space in the middle of the campus. The 65.7 million dollars Thomas W. Keating Bioresearch Building and the 54.4 million dollars Medical Research Building are challenging builders on the north side of campus with a project connecting two massive buildings under construction at the same time by two separate general contractors, right next door to another large-scale construction project.
机译:图森的亚利桑那大学正在经历其医学和科研设施的主要扩展阶段。 Meinel光学科学大楼的扩建和Roy P. Drachman Hall扩建即将完成,该大楼将为药房,公共卫生和护理部门提供学术空间。同时,三个总价值超过1.5亿美元的基建项目准备为学校提供更多的科学研究和实验室空间。这座耗资4610万美元的化学大楼将被楔入校园中间一个极为狭窄的空间。价值6,570万美元的Thomas W. Keating生物研究大楼和5,440万美元的医学研究大楼正在校园的北部,对建设者构成挑战,该项目由两个独立的总承包商同时连接两座正在建设的大型建筑,另一个大型建设项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号