首页> 外文期刊>Southwest Contractor >Plans for Pleasant Water/Massive Water Treatment Plant Combines Technologies
【24h】

Plans for Pleasant Water/Massive Water Treatment Plant Combines Technologies

机译:宜人的水/大型水处理厂计划结合技术

获取原文
获取原文并翻译 | 示例
           

摘要

Better tasting water is on tap for Phoenix residents. Phoenix, along with other Valley cities, has long struggled with poor- tasting tap water, but a new, 320-million-gallons-a-day water treatment plant on Lake Pleasant Road will change that. The new plant is being constructed in phases. The first, an 80-mgd project, is under construction. The 228 million dollars project is scheduled for operation in February 2007, with construction. finishing in mid-2006 followed by a startup period. Total contract value is 330 million dollars.
机译:凤凰城居民可以品尝到更好的品尝水。凤凰城和山谷地区的其他城市长期以来一直在苦苦品尝自来水,但在普莱森特湖(Lake Pleasant Road)新建的日处理水量达3.2亿加仑的新水处理厂将改变这种状况。新工厂正在分阶段建设。第一个80毫克的项目正在建设中。这个耗资2.28亿美元的项目计划于2007年2月开始运营,并进行建设。在2006年中期完成,随后是启动阶段。合同总价值3.3亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号