CityCenter Components Delayed, Cancelled

机译:CityCenter组件延迟,取消

获取原文
获取原文并翻译 | 示例
           

摘要

Defective construction resulting in costly repairs has caused cash-strapped MGM Mirage Inc. to slash condo plans at its 9.2-billion dollars CityCenter development on the Las Vegas Strip, says CityCenter President and CEO Robert "Bobby" Baldwin. On Jan. 7, the casino giant said it is cutting the Harmon Hotel & spa in half by eliminating 200 high-end residences, of which 44 percent have been sold. The oval-shaped, cast-in-place concrete tower is designed by London-based Foster + Partners. Halcrow Yolles Structural Engineers is the structural engineer and Perini Building Co. is the general contractor. In July, Clark County building inspectors said Perini, which is self-performing CityCenter's concrete work, had moved reinforcing rebar floor links that transfer horizontal loading to the shear walls without approval from the project's structural engineer or county building officials. Work was stopped until repairs were made. Century Steel Inc., Las Vegas, is the rebar subcontractor. "Congestion" was to blame for the decision, says a project source who requested anonymity, "Too much rebar knotted together prevented the proper amount of concrete coverage," the source says. "It's a common dilemma."
机译:CityCenter总裁兼首席执行官Robert“ Bobby” Baldwin说,由于建筑缺陷导致维修成本高昂,导致资金短缺的MGM Mirage Inc.削减了其在拉斯维加斯大道上耗资92亿美元的CityCenter开发项目的公寓计划。 1月7日,这家赌场巨头表示将通过淘汰200套高端住宅将Harmon Hotel&spa减少一半,其中44%已售出。椭圆形的现浇混凝土塔是由伦敦的Foster + Partners设计的。 Halcrow Yolles结构工程师是结构工程师,Perini Building Co.是总承包商。克拉克县建筑检查员在7月表示,Perini是自给自足的CityCenter的混凝土工程,在未经项目结构工程师或县建筑官员批准的情况下,已经移动了钢筋钢筋地板连接件,将水平荷载转移到剪力墙。停止工作,直到进行维修。拉斯维加斯的Century Steel Inc.是钢筋分包商。一位不愿透露姓名的项目消息人士说,该决定归咎于“交通拥堵”,“太多的钢筋打结阻碍了适当数量的混凝土覆盖,”该消息人士说。 “这是一个普遍的困境。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号