首页> 外文期刊>Southwest Contractor >Fontainebleau Rolls Snake Eyes, Halts Construction
【24h】

Fontainebleau Rolls Snake Eyes, Halts Construction

机译:枫丹白露劳斯蛇眼,停工

获取原文
获取原文并翻译 | 示例
           

摘要

On June 9, the $3.1-billion Fontainebleau Las Vegas, which is about 70% complete, filed for Chapter 11 bankruptcy protection. Construction of the 63-story hotel-casino-retail complex is now halted. Scheduled to open in October, the project is being built by Fontainebleau Resorts LLC, an investment group led by Miami-based developer Jeffery Softer, owner of the Morris Lapidus Fontainebleau hotel in Miami Beach. The bankruptcy filing follows the departure of Glenn Schaeffer, Fontainebleau Resorts' co-founder and top executive, in late May. His position as CEO, president and member of its board of managers remains vacant.
机译:6月9日,耗资31亿美元的拉斯维加斯枫丹白露(已完成约70%)申请了第11章的破产保护。 63层高的酒店-赌场-零售综合大楼的建设现已暂停。该项目计划于10月开业,由枫丹白露度假村有限责任公司(Fontainebleau Resorts LLC)建造,该投资集团由位于迈阿密的莫里斯·拉皮杜斯·枫丹白露酒店的所有者,迈阿密开发商Jeffery Softer领导。枫丹白露度假村的联合创始人兼最高执行官格伦·舍弗(Glenn Schaeffer)于5月下旬离职,申请破产。他担任首席执行官,总裁和董事会成员的职位空缺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号