首页> 外文期刊>Southwest Contractor >New Public and Private Construction Projects Get Underway
【24h】

New Public and Private Construction Projects Get Underway

机译:新的公共和私人建筑项目正在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

CORE to Build New Elementary School CORE Construction-Nevada began construction on Mark L. Fine Elementary School at 6635 w. Cougar Ave. in Southwest Las Vegas for the Clark County School District. The 68,875-sq-ft, single-story school is situated on 30 acres and includes four blocks of classrooms, a multipurpose room, library, enclosed exterior courtyards and playgrounds. The plan calls for reinforced masonry walls with structural steel, single-ply roofing and a central plant for heating and cooling. Completion is scheduled for July 2009. JMA is the architect of record for the 18.7 million dollars project.
机译:建造新小学的核心CORE Con​​struction-Nevada于6635 w开始在Mark L. Fine小学上建造。拉斯维加斯西南区的美洲狮大道(Cougar Ave.),位于克拉克县学区。这座占地68,875平方英尺的单层学校占地30英亩,包括四个教室,一个多功能室,图书馆,封闭的外部庭院和游乐场。该计划要求使用结构钢,单层屋面和供暖和制冷的中央厂房来加固砌体墙。该项目计划于2009年7月完成。JMA是这个1,870万美元项目的记录建筑师。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号