首页> 外文期刊>Oil & Gas Eurasia >Packer Service Offers Integrated Approach to Multistage Completion of Horizontal Wells
【24h】

Packer Service Offers Integrated Approach to Multistage Completion of Horizontal Wells

机译:封隔器服务为水平井的多阶段完井提供综合方法

获取原文
获取原文并翻译 | 示例
           

摘要

Demand for multistage tracking completions in horizontal wells in Russia grew significantly in the last few years. Alongside with leading oilfield service companies, Packer Service performs multistage hydraulic fracs in West Siberia. Our customers, oil-producing companies spend much time and money on well construction, completion, stimulation and clean-up prior to putting them on stream. One of the main issues at the stage of designing and construction of horizontal wells is selection of the optimum profile of the well and an assembly for the multistage hydraulic fracturing, which would make it possible to create a well design, which ensures the optimal capability of coiled tubing and production tubing to reach the bottom-hole for well servicing.
机译:在过去几年中,俄罗斯水平井中对多级跟踪完井的需求大幅增长。 Packer Service与领先的油田服务公司一道,在西西伯利亚执行多级液压压裂。我们的客户,石油生产公司在投入生产之前,会花费大量时间和金钱进行油井的建造,完井,增产和清理工作。在水平井的设计和建造阶段,主要问题之一是选择最佳的井眼轮廓和用于多级水力压裂的组件,这将有可能创建一个井眼设计,从而确保最佳的采油能力。连续油管和生产油管到达井底以进行井眼维修。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号