首页> 外文期刊>Russian Journal of Non-Ferrous Metals >FURTHER EXTRACTION OF ORE DEPOSITS BY UNDERGROUND MINING IN THE PIT INFLUENCE ZONE
【24h】

FURTHER EXTRACTION OF ORE DEPOSITS BY UNDERGROUND MINING IN THE PIT INFLUENCE ZONE

机译:矿山影响区地下开采对矿床的进一步提取

获取原文
获取原文并翻译 | 示例
           

摘要

The rational utilization and comprehensive exploitation of the mineral deposits is the basis for the growth of the mining industry and for the expansion of the economic potential of any country. But the present economic crisis that is affecting the East European countries, including the countries newly formed after the collapse of the USSR, is forcing us to include in the processing cycle the reserves of only the richest segments of the mineral deposit. This makes it possible for the mining enterprises to survive in the present difficult economic conditions. However, the selective exploitation of the segments of the deposit that are rich with regard to the content of the useful components leads to change of the stress-strain state of the undermined rock mass, which must be considered in the further extraction of the remaining ore reserves. Therefore the main task at the present time in planning the working of the deposits of the useful minerals is the rational utilization of the deposit ore reserves with subsequent further mining when the economic crisis eases. These questions were considered in preparing the working plan for the further mining by the underground technique of the reserves of the Alpys (Kazakhstan) deposit.The Alpys deposit has been mined by the surface technique since 1979. At the present time because of the large lag in the overburden operations (about 4.7 million m~3 from the planned contour), and also in connection with the current economic situation of the enterprise, operations in the pit have essentially been stopped at the 190 m level. On the basis of the data of a survey made of the AO "Maikainzoloto" enterprises by the specialists of Giprotsvetmet (State Institute for the Planning of Nonferrous Metallurgy Establishments) in September of 1997 under contract with the firm "East Point Holdings", the preliminary Technical/Economic Calculations were performed, on the basis of which the feasibility was determined of further mining of the remaining reserves of the deposit by the combined (surface and underground) technique. It was proposed to work the upper part of the remaining reserves by the surface mining technique, and the lower part by the underground technique.
机译:矿藏的合理利用和综合开发是采矿业发展和任何国家经济潜力扩大的基础。但是,目前影响东欧国家(包括苏联解体后新组建的国家)的经济危机正迫使我们在加工周期中仅包括矿床中最富裕部分的储量。这使采矿企业有可能在当前困难的经济条件下生存。但是,对矿床中有用成分含量丰富的段的选择性开采会导致被破坏的岩体的应力应变状态发生变化,这在进一步提取剩余矿石时必须考虑储备。因此,当前规划有用矿床的工作的主要任务是在经济危机缓解时合理利用矿床的储量并随后进一步开采。在通过地下技术对Alpys(哈萨克斯坦)矿床的储量进行进一步开采的工作计划中考虑了这些问题。自1979年以来,Alpys矿床就已经通过地面技术进行了开采。在上覆作业中(距计划轮廓约470万立方米),并且结合企业当前的经济状况,基坑作业基本上已在190 m处停止。根据Giprotsvetmet(国家有色冶金企业计划研究所)专家在1997年9月与“ East Point Holdings”公司签订的合同下对AO“ Maikainzoloto”企业进行的调查数据,初步进行了技术/经济计算,在此基础上确定了通过组合(地面和地下)技术进一步开采矿床剩余储量的可行性。建议通过地面采矿技术来开采剩余储量的上部,通过地下技术来开采下部的储量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号