Revision of coal reserves and placement of exploitation fields in exploitation of the lignite deposit in Premogovnik Velenje

机译:修订普雷莫戈夫尼克韦伦杰褐煤矿床的煤炭储量和开发田地位置

获取原文
获取原文并翻译 | 示例
           

摘要

Coal (brown coal and lignite) is the only fossil fuel available in Slovenia, representing approximately 21 % of primary energy consumption. Due to environmental reasons, the use of coal is directed only to thermal energy generating facilities with appropriate flue gas cleaning technologies. Premogovnik Velenje (PV) is a modern equipped and highly productive coal mine providing lignite exclusively to Termoelektrarna Sostanj for its production of electricity and thermal energy. PV exploits a deposit of exceptional dimensions in which they developed their own, highly productive exploitation method with underground production and can compete, in productivity and coal prices, with the world's best underground coal mines. The quantities of domestic production of coal cover 78.0 % of all planned demands for solid fuels. In the Saleska dolina valley, the balance sheet reserves of coal in coal deposit in PV amount to 171 million tonne on 31st December 2008 and 131,67 million tonne of exploitation reserves with average calorific value of 10.47 GJ/t. Projections for further production of coal are related to long-term operation of the Sostanj Thermal Power Plant (TES) which will invest in the 600 MW generator unit 6. PV is the only supplier of coal for TES. Until the year 2021, the level of production of coal will amount to 4 million tonne per year. In the period until the year 2040, it will gradually decrease to the level of 2 million tonne per year and will remain at this level until the end of exploitation of the Velenje exploitation field in the year 2053.
机译:煤(褐煤和褐煤)是斯洛文尼亚唯一可用的化石燃料,约占一次能源消耗的21%。由于环境原因,仅将煤的使用指向具有适当烟道气清洁技术的热能发电设施。 Premogovnik Velenje(PV)是一家装备精良,生产率高的现代化煤矿,专门为Termoelektrarna Sostanj提供褐煤,以生产电力和热能。 PV开采具有超凡规模的矿床,他们利用地下开采开发了自己的高产开采方法,并且可以在生产率和煤炭价格方面与世界上最好的地下煤矿竞争。煤炭的国内生产量占所有计划的固体燃料需求的78.0%。在萨勒斯卡多利纳河谷,截至2008年12月31日,PV储煤中的煤炭资产负债表储量为1.71亿吨,平均热值为10.47 GJ / t的开采储量为13167万吨。进一步生产煤炭的计划与Sostanj热电厂(TES)的长期运营有关,该电厂将投资600 MW发电机组6。PV是TES的唯一煤炭供应商。到2021年,煤炭产量将达到每年400万吨。在直到2040年的时期内,它将逐渐减少到每年200万吨的水平,并将一直保持这一水平,直到2053年对Velenje开采场的开采结束。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号