...
首页> 外文期刊>Natural Gas Week. >McMoRan Delays Flow Tests at Davy Jones
【24h】

McMoRan Delays Flow Tests at Davy Jones

机译:McMoRan推迟了Davy Jones的流量测试

获取原文
获取原文并翻译 | 示例
           

摘要

McMoRan Exploration has run into complications in preparing for its flow test of the Davy Jones No. 1 well on South Marsh Island Block 230 in the shallow Gulf of Mexico. New Orleans-based McMoRan said last week that its engineers have seen a positive pressure response from the Wilcox D sand, which was perforated on Mar. 24. However, an attempt to perforate the Wilcox C sand met with problems.
机译:McMoRan Exploration在准备在墨西哥湾浅水区南沼泽岛230区块的Davy Jones 1号井进行流量测试时遇到了麻烦。总部位于新奥尔良的McMoRan上周表示,其工程师已经从3月24日打孔的Wilcox D砂中看到了正压力响应。但是,对Wilcox C砂打孔的尝试遇到了问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号