...
首页> 外文期刊>Mining Mirror >Khutala places R20m machine order
【24h】

Khutala places R20m machine order

机译:库塔拉下令订购R20m机

获取原文
获取原文并翻译 | 示例
           

摘要

A R20-million order has been won by Oldenburg Stamler for its coal winning machines, from Khutala colliery in Mpumalanga - after going head-to-head at the coal face against the equipment of a rival manufacturer.The order comprises six BH20A battery-powered coal haulers with 20t capacity, and two BF14A Stamler feeder breakers. The Wadeville-based company was also awarded a significant parts contract in addition to the machine order. The deployment of these US-manufactured machines at the mine in March and July will bolster its existing fleet of Oldenburg Stamler equipment - three BH20A coal haulers have been in service at Khutala since 1998.
机译:奥尔登堡·斯塔姆勒(Oldenburg Stamler)从姆普马兰加(Mpumalanga)的库塔拉煤矿(Khutala)煤矿赢得了价值2000万雷亚尔的制煤机订单,与竞争对手的制造商进行了面对面的煤面对面订单。该订单包括六台BH20A电池供电的电池容量为20吨的煤炭运输车和两个BF14A Stamler进料破碎机。除了机器订单外,这家位于韦德维尔的公司还获得了重要的零件合同。这些在美国制造的机器将于3月和7月在该矿场部署,这将增强其现有的Oldenburg Stamler设备机队-自1998年以来,三架BH20A煤炭运输车已在Khutala投入使用。

著录项

  • 来源
    《Mining Mirror》 |2000年第1期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号