...
首页> 外文期刊>Gold & Minerals Gazette >Sino clocks up milestone at Jinfeng DEPOSIT
【24h】

Sino clocks up milestone at Jinfeng DEPOSIT

机译:信诺在金丰DEPOSIT取得里程碑

获取原文
获取原文并翻译 | 示例
           

摘要

Defining a resource of more ) than 4 million ounces at its Jinfeng deposit marks quite a milestone for Sino Gold Ltd. Resources at the deposit have increased to 25.3 million tonnes grading 5 grams/tonne for a contained 4.04 million ounces. Included in this are measured and indicated resources totalling 21.2 Mt at 4.9 g/t for 3.32 million oz. The Sydney-based Sino has been active in China since 1996 and is the country's largest foreign gold producer. It is developing the Jinfeng mine in Guizhou Province and operating the Jianchaling gold mine in Shaanxi Province. Once fully developed, Jinfeng will be the second largest gold mine in China with production of 180,000 ounces per annum and potentially the largest when the phase two expansion increases capacity to 300,000 ozpa.
机译:在金丰矿床定义的资源超过400万盎司,对于Sino Gold Ltd.而言是一个里程碑。该矿床的资源已增加到2530万吨,等级为5克/吨,包含404万盎司。其中包括332万盎司,4.9 g / t的总计21.2 Mt的已测量和指示资源。自1996年以来,总部位于悉尼的信诺(Sino)一直活跃于中国,并且是该国最大的外国黄金生产商。它正在开发贵州省的金峰矿山,并在陕西省运营剑茶岭金矿。一旦全面开发,金丰将成为中国第二大金矿,年产量为18万盎司,如果二期扩建将产能提高到30万盎司,则可能是最大的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号