...
首页> 外文期刊>Building design >...as HdM's other projects stumble
【24h】

...as HdM's other projects stumble

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

Two schemes by Herzog de Meu-ron in the UK are facing uncertainty. Last week, the firm's ambitious design for a 45,000-seat stadium for Portsmouth Football Club with Sellar Property Group, was put on hold until as late as 2022.Now, the practice's plans for the country's tallest residential tower scheme - a London project (also for Sellar) dubbed Three Houses, revealed by BD in January - has also been delayed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号