首页> 外文期刊>Energy Strategy Reviews >Power generation and cross-border grid planning for the integrated ASEAN electricity market: A dynamic linear programming model
【24h】

Power generation and cross-border grid planning for the integrated ASEAN electricity market: A dynamic linear programming model

机译:东盟一体化电力市场的发电和跨境电网规划:动态线性规划模型

获取原文
获取原文并翻译 | 示例
           

摘要

The central question raised in this study is how to meet the growing power demand in ASEAN countries in the next two decades. Uneven distribution of energy resources and uneven paces of economic development among ASEAN countries complicate the question. The ASEAN Power Grid (APG) that interconnects all ASEAN countries and enables cross-border power trade could potentially provide cost-saving solutions. This study builds a dynamic linear programming model and simulates optimal development paths of power generation capacities in ASEAN countries. Scenarios are built around the assumptions about the power trade policy regimes. It is found that more open power trade regime encourages development of renewable sources of power generation, and accrues more savings in the total cost of meeting the growing future power demand from 2010 to 2030.
机译:这项研究提出的中心问题是如何在未来二十年中满足东盟国家不断增长的电力需求。东盟国家之间能源资源分配不均和经济发展步伐不平衡使问题复杂化。连接所有东盟国家并实现跨境电力贸易的东盟电网(APG)可能会提供节省成本的解决方案。该研究建立了动态​​线性规划模型,并模拟了东盟国家发电能力的最佳发展路径。场景围绕有关电力贸易政策制度的假设构建。人们发现,更开放的电力贸易体制鼓励发展可再生能源,并在满足2010年至2030年未来不断增长的电力需求的总成本中节省更多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号