首页> 外文期刊>Bulletin for sports surface management >A PITCH SUITABLE FOR THE GOLDEN LILIES
【24h】

A PITCH SUITABLE FOR THE GOLDEN LILIES

机译:适用于金百合的音调

获取原文
获取原文并翻译 | 示例
           

摘要

The focus for the 2014 World Cup in Brazil and much of the media attention was very much on the Stadium pitches. In reality each national team would only arrive at the Stadium one or two days before their fixture as they would train in the Stadium theday before their game. If they arrived two days before the event, each host city had two training pitches that they could utilise. Prior to this each team would be based at their Team Base Camp (TBC). This meant that there were thirty two TBCs located throughout Brazil and fifteen of these were in the State of Sao Paulo alone. Each TBC had all the facilities that a national team might require during their stay and this included a training pitch that was reflective of the conditions they would encounter in the main stadia. Replication of main stadia conditions was challenging when considering the vast expanse of the country, variations in climatic conditions and different grass species that exist from one end of Brazil to the other.
机译:2014年巴西世界杯足球赛的焦点和体育馆的球场非常受媒体关注。实际上,每个国家队只能在比赛开始前一两天到达体育场,就像他们在比赛前一天在体育场训练一样。如果他们在活动开始前两天到达,则每个主办城市都有两个可以利用的训练场。在此之前,每个团队都将以其团队大本营(TBC)为基地。这意味着在整个巴西有32个TBC,仅在圣保罗州就有15个。每个TBC都有国家队在逗留期间可能需要的所有设施,其中包括一个训练场,反映了他们在主体育场中会遇到的状况。考虑到巴西广阔的土地,气候条件的变化以及从巴西一端到另一端存在的不同草种,要复制主要球场的状况是一项挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号