首页> 外文期刊>E & P: A Hart Energy Publication >Engineered completion designs boost effectiveness: There is a whole cornucopia of technologies that is available to aid in efficiency
【24h】

Engineered completion designs boost effectiveness: There is a whole cornucopia of technologies that is available to aid in efficiency

机译:工程完井设计可提高效率:可以利用各种技术来提高效率

获取原文
获取原文并翻译 | 示例
           

摘要

I think the real issue for completions is to get from being very efficient to being efficient and effective. We see that a high percentage - 25% or 35% - of perforation clusters do not produce. This is something that we know how to fix with engineered completion designs. By grouping completion stages and clusters according to reservoir quality and completion quality, we can get 100% of perforations producing. That makes everything more effective and drives cost per unit down. That is what I would say is the next step.
机译:我认为完成工作的真正问题是要从非常有效率变成有效率又有效率。我们看到高比例的穿孔簇(25%或35%)不会产生。这是我们知道如何解决工程完工设计的问题。通过根据完井质量和完井质量对完井阶段和聚类进行分组,我们可以获得100%的射孔产量。这使一切都更加有效,并降低了单位成本。我要说的就是下一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号