首页> 外文期刊>E & P: A Hart Energy Publication >MPD technology enables drilling in Pakistan's Badhra field
【24h】

MPD technology enables drilling in Pakistan's Badhra field

机译:MPD技术可在巴基斯坦的Badhra油田进行钻探

获取原文
获取原文并翻译 | 示例
           

摘要

A new control system enables influxes and losses to be managed while navigating narrow pressure margins and ultimately allows access to a deep, previously unreachable drilling target. In 1998, Lasmo Oil began drilling the Badhra #2 well, targeting the Lower Cretaceous Goru and Sembar sands. However, a high-pressure sequence forced the operator to stop. Available casing strings were consumed at a measured depth (MD) of 11,483 ft (3,500 m); furthermore, managing the high levels of background gas and fluid losses in the 6-in. hole proved impossible.
机译:一个新的控制系统可以在狭窄的压力裕度范围内管理涌入和损失,并最终允许进入较深的,以前无法到达的钻井目标。 1998年,Lasmo Oil开始在下白垩统Goru和Sembar砂岩上钻探Badhra#2井。但是,高压顺序迫使操作员停止。可用的套管柱在11​​,483英尺(3,500 m)的测量深度(MD)下被消耗掉了。此外,还可以在6英寸压力下管理高水平的背景气体和流体损失。孔被证明是不可能的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号