首页> 外文期刊>Australian Mining >Hlsmelt plant ramps up/Ramp up signals a new era of cleaner, more efficient iron production
【24h】

Hlsmelt plant ramps up/Ramp up signals a new era of cleaner, more efficient iron production

机译:Hlsmelt工厂的产能提升/产能提升标志着更清洁,更高效的钢铁生产新纪元

获取原文
获取原文并翻译 | 示例
           

摘要

Rio Tinto's new commercial-scale HIsmelt plant has begun continuous production of molten iron from its smelt reduction vessel at Kwinana in Western Australia. Construction of the plant, which took two years and cost more than 400m dollars, was completed in April and has been progressively commissioned since then. Rio Tinto has spent more than 600m dollars over the last 20 years in developing this technology. The plant will now move into a ramp-up phase and is expected to reach its full production rate of 800,000tpa over the next three years.
机译:力拓(Rio Tinto)新建的商业规模的HIsmelt工厂已经开始通过其位于西澳大利亚州Kwinana的熔炼还原炉连续生产铁水。该工厂的建设历时两年,耗资超过4亿美元,已于4月份完成,此后逐步调试。在过去的20年中,力拓(Rio Tinto)已花费超过6亿美元开发这项技术。该工厂现在将进入增产阶段,并有望在未来三年内达到其800,000吨/年的全部生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号