首页> 外文期刊>Arab Oil & Gas >GDF Suez Offers to Finance Phase 1 of a 200-MW Expansion of Power Generation Capacity
【24h】

GDF Suez Offers to Finance Phase 1 of a 200-MW Expansion of Power Generation Capacity

机译:GDF苏伊士提供200兆瓦发电能力扩展的第一阶段融资

获取原文
获取原文并翻译 | 示例
           

摘要

On the occasion of a visit to Lebanon of a delegation from GDF Suez and in order to help the government resolve its chronic power shortage problem, the French company suggested to the Lebanese President, Mr. Michel Soleiman, and the Prime Minister, Mr. Saad Hariri, that it expand the country's power generation capacity by 200 MW. The additional facilities, which would run on renewable energies, would be installed in four 50-MW phases, the first of which would be financed by GDF Suez.
机译:在法国苏伊士集团的一个代表团访问黎巴嫩之际,为了帮助政府解决其长期的电力短缺问题,这家法国公司向黎巴嫩总统米歇尔·索莱曼先生和总理萨德先生提出了建议。哈里里(Hariri)认为,该国的发电能力将增加200兆瓦。这些将使用可再生能源运行的额外设施将分四个50兆瓦阶段安装,其中第一阶段将由苏伊士集团提供资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号