Problem statement: A simple calculation has shown what the impact of muck created during the construction of a hypothetical 50 km long and 100 m2 cross section tunnel could be on the environment: around 8 million cubic meters would have to be discharged as waste material. One solution to such a problem could be to recycle (almost a part) the earth material, that is, the muck and debris that are excavated from the tunnel face. Approach: In order to verify the possibility of using some different breakers from the ones used in the handling plant on the studied tunnel-access, some tests were performed in the DITAG laboratory at the Politecnico DI Torino. Results and Conclusion: Different cut dimensions were considered in the recycling of the muck material from the tunnel excavation using TBMs. The obtained material, mixed with natural sands and gravels according to various hypotheses, corresponds to the dimensional requirements for the shotcrete and concrete aggregates. The optimal solution should be the mixture of the best fines produced by TBM, the products of the broken rock and some percentage of natural sands and gravels. The final choice will depend on economic factors and obviously also on the particular features in the work sites.
机译:问题陈述:一个简单的计算表明,假想的50公里长和100 m 2 断面隧道的建设过程中产生的渣土会对环境产生什么影响:大约800万立方米作为废物排放。解决该问题的一种方法是回收(几乎一部分)从隧道工作面挖出的泥土和碎屑。方法:为了验证使用与所研究的隧道通道上的处理厂使用的破碎锤不同的破碎锤的可能性,在Politecnico DI Torino的DITAG实验室进行了一些测试。结果与结论:在使用TBM进行隧道开挖的渣土回收过程中,考虑了不同的切割尺寸。所获得的材料根据各种假设与天然沙子和砾石混合,符合喷射混凝土和混凝土集料的尺寸要求。最佳解决方案应该是由TBM产生的最佳细粉,碎岩石的产品以及一定比例的天然沙子和砾石的混合物。最终选择将取决于经济因素,并且显然还取决于工地的特定功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号