Reservoir development optimization under uncertainty for infill well placement in brownfield redevelopment

机译:棕色地区重建填充井井井井井井储存器发展优化

获取原文
获取原文并翻译 | 示例
           

摘要

In an uncertain oil price environment, brownfield redevelopment is becoming an increasingly attractive option to manage production decline. One of the essential strategies in brownfield redevelopment is optimally placing the infill well to maximize recovery from the field and minimize operational expenditure. Optimal decisions are the ones that maximize the recovery and keep the cost down. Robust optimal decisions are the ones that would hold in the presence of geological uncertainty, such as when the realization of reservoir setting deviates from the base case. The decision optimized for the base case would still be optimal for the updated reservoir condition. Hence, optimization across multiple realizations is required. While attempts on the optimization across multiple realizations have been conducted in the literature, the computational cost involved in performing the task and resulting in the proper estimation of uncertainty remains a great challenge.
机译:在不确定的油价环境中,布朗菲尔德重建正在成为管理生产下降的越来越有吸引力的选择。 布朗菲尔德重建中的一个基本策略之一是最佳地将填充井放大,以最大限度地从现场恢复,并最大限度地减少操作支出。 最佳决策是最大化恢复并保持成本的最佳决策。 稳健的最佳决策是在存在地质不确定性的情况下保持的最佳决定,例如当储层设置的实现偏离基本情况时。 对于更新的储层条件,对基本情况优化的决定仍然是最佳的。 因此,需要多种实现的优化。 虽然在文献中进行了多次实现的优化尝试,但在进行任务中涉及的计算成本并导致正确估计不确定性仍然是一个巨大的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号