首页> 外文期刊>Journal of Protective Coatings & Linings >THE LOST ART OF CONTROLLING SITE CLEANLINESS:NEW METHODS FOR VERIFICATION & WHY IT'S IMPORTANT
【24h】

THE LOST ART OF CONTROLLING SITE CLEANLINESS:NEW METHODS FOR VERIFICATION & WHY IT'S IMPORTANT

机译:控制网站清洁艺术:验证的新方法和为什么它很重要

获取原文
获取原文并翻译 | 示例
           

摘要

If you are a QP 2 contractor,have performed lead removal since the 1990s,or own a structure that contains hazardous materials in the existing coating system,then you've seen requirements for preventing environmental releases and maintaining site cleanliness.Major bridge-painting specifications by the Triborough Bridge and Tunnel Authority(TBTA),Delaware River Port Authority(DRPA) and PennDOT,and federal Unified Facilities Guide Specifications(UFGS),among countless others,have multiple references and sometimes even entire sections devoted to prevention of releases,environmental protection,spill prevention and more.SSPC certification programs require environmental-protection and waste-management plans,and SSPC documents such as Guide 6,”Guide for Containing Debris Generated During Paint Removal Operations” describe necessary controls to prevent releases.SSPC-TU 7,”Conducting Ambient Air,Soil and Water Sampling of Surface Preparation and Paint Disturbance Activities” provides monitoring strategies to verify cleanliness.EPA and OSHA require hazardous-waste and hazardous-materials programs,training,spill prevention/control and documentation.
机译:如果您是QP 2承包商,自20世纪90年代以来已经进行了铅拆卸,或者拥有现有涂层系统中含有危险物质的结构,然后您已经看到了预防环境释放和维护场地清洁度的要求.MAJOR桥梁规格由Triborough Bridge and Tounel Inserions(TBTA),特拉华河港口管理局(DRPA)和Penndot,以及联邦统一设施指南规范(UFGS)在无数的其他人中有多种参考,有时甚至整个部分都致力于预防释放,环境保护,泄漏预防和更多.SSPC认证计划需要环境保护和废物管理计划,以及SSPC文件,如指南6,“绘画清除操作期间产生的碎片指南”描述了防止释放的必要控制.SSPC-TU 7 ,“进行环境空气,地面制备和油漆干扰活动的环境空气,水采样”提供监测S.违反Cleanliness.epa和OSHA的违规行为需要危险废物和危险材料计划,培训,泄漏预防/控制和文件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号