首页> 外文期刊>BARC Newsletter >MANUFACTURE OF INSTRUMENTED STEAM GENERATORS FOR FISBE PROJECT
【24h】

MANUFACTURE OF INSTRUMENTED STEAM GENERATORS FOR FISBE PROJECT

机译:FISBE项目的仪表式蒸汽发生器的制造

获取原文
获取原文并翻译 | 示例
           

摘要

CDM has successfully manufactured and delivered two Instrumented Steam Generators for the FIBSE (Facility for Integral System Behavior Experiments) project, based on the design and drawings, provided by the Reactor Engineering Division. The FISBE facility simulates the Primary Heat Transport (PHT) system of a 235 MWe PHWR, viz., the Fuel Rod Cluster Simulators (FRCS), the Steam Generators (SGs), the Emergency Core Cooling System (ECCS), the Feed and the Bleed systems, along with their associated control systems. The facilty is to be used for conducting thermal hydraulic experiments, by simulating steady state, transient and accidental conditions in a PHWR.
机译:CDM根据反应堆工程部提供的设计和图纸,成功地为FIBSE(整体系统行为试验设施)项目制造并交付了两台仪表式蒸汽发生器。 FISBE设施可模拟235 MWe PHWR的一次传热(PHT)系统,即燃料棒群集模拟器(FRCS),蒸汽发生器(SGs),应急堆芯冷却系统(ECCS),进料和排气系统及其相关的控制系统。该设施将用于通过模拟PHWR中的稳态,瞬态和偶然条件进行热力水力实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号