【24h】

Aminex Tanzania double imminent

机译:坦桑尼亚Aminex迫在眉睫

获取原文
获取原文并翻译 | 示例
       

摘要

Aminex will spud the first of up to two wells in Tanzania within weeks. The Caroil 2 rig will start with the Ntorya-2 well on the Ruvuma block to appraise the 2012 discovery. This tested at 20 MMcf/d of gas and 139 b/d of condensate and resulted in the withdrawal of then operator Tullow Oil which was hoping for an oil find. Reserves are currently put a 158 Bcf of gas and the appraisal well is hoping to add a similar figure. It is being drilled around 1.5km west of the discovery well and is given an impressive 60% chance of success.
机译:Aminex将在几周内在坦桑尼亚的多达两口井中钻出第一口。 Caroil 2钻机将从Ruvuma区块的Ntorya-2井开始,以评估2012年的发现。在20 MMcf / d的天然气和139 b / d的凝析油下进行了测试,结果撤出了当时希望寻找石油的操作员Tullow Oil。目前储量为158 Bcf天然气,评估井希望增加一个类似的数字。它在发现井以西约1.5公里处钻探,获得成功的机会高达60%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号