...
首页> 外文期刊>World Oil >Drill pipe-based completion workover risers lower costs and increase operational efficiency
【24h】

Drill pipe-based completion workover risers lower costs and increase operational efficiency

机译:基于钻杆的完成工作服提升者降低成本并提高运营效率

获取原文
获取原文并翻译 | 示例
           

摘要

The deepwater and ultra-deepwater sectors of offshore drilling have remained challenged through various market conditions.Volatility in pricing and an ongoing quest to increase cost efficiency has led to continued technical innovation,driven by the requirement to achieve higher breakeven prices typical of offshore developments.Using oil country tubular goods(OCTG)completion workover risers(CWORs)in deep-water projects has been cited as an alternative to drill pipe-based CWORs due to the inherent challenges of designing drill pipe connections that adhere to such rigorous environmental standards and difficult service conditions. However,drill pipe has advanced technologically and is now a viable,cost-effective solution,in even the most challenging completion and intervention operations.While conventional OCTG solutions do provide some upfront cost benefit,drill pipe-based CWORs show significantly reduced total cost of ownership over the life of the product.
机译:海水钻井的深水和超深水部门通过各种市场条件造成挑战。定价和持续寻求提高成本效率的持续性导致了持续的技术创新,这一要求实现了典型的海上发展典型的盈亏平衡价格。 使用石油国家管状物品(OCTG)完成的深水工程中的工作台(CWORS)被引用作为钻取基于管道的CWORS的替代方案,这是由于设计钻杆连接的固有挑战,该钻探管道连接到这种严谨的环境标准和困难 服务条件。 然而,钻杆技术先进,现在是一种可行,具有成本效益的解决方案,即使是最具挑战性的完成和干预操作。当传统的OCTG解决方案确实提供了一些前期成本效益,基于钻杆的CWORs显示出总成本显着降低了总成本 对产品生活的所有权。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号