首页> 外文期刊>The HKIE Transactions >Novel engineering techniques to overcoming traditional challenges in online condition monitoring systems for power transformer
【24h】

Novel engineering techniques to overcoming traditional challenges in online condition monitoring systems for power transformer

机译:克服电力变压器在线状态监测系统中传统挑战的新工程技术

获取原文
获取原文并翻译 | 示例
           

摘要

Traditional challenges in online condition monitoring systems for power transformer are usually due to discrepant results between online condition monitoring system and lab-based measurements (e.g. Dissolved Gas Analysis) and unreliable performance of electronic components due to exposure to harsh outdoor substation environment. As a result, false alarms and service alarms would be generated and extra maintenance efforts are needed to tackle these issues. This will exert additional pressure to frontline staff and engineers. These undesired outcomes are challenges to the implementation of condition monitoring scheme. Several novel engineering techniques and effective contract management method will be presented in this paper to elaborate the ways to overcome these traditional challenges in online condition monitoring systems to ensure effective condition-based maintenance scheme and enhance power supply reliability.
机译:电力变压器的在线状态监测系统中的传统挑战通常是由于在线状态监测系统和基于实验室的测量(例如,溶解气体分析)和由于暴露于苛刻的户外变电站环境而不可靠的电子元件性能之间的差异。 因此,将产生虚假警报和服务警报,并且需要额外的维护工作来解决这些问题。 这将对前线员工和工程师发起额外的压力。 这些不期望的结果是对实施条件监测计划的挑战。 本文将提出几种新颖的工程技术和有效的合同管理方法,详细阐述了在线状态监测系统中克服这些传统挑战的方式,以确保基于有效的基于条件的维护方案,并提高电源可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号