首页> 外文期刊>STRI Bulletin >THREE SIMPLE METHODS FOR LEVELLING TEES
【24h】

THREE SIMPLE METHODS FOR LEVELLING TEES

机译:三个简单的平台方法

获取原文
获取原文并翻译 | 示例
           

摘要

For an attractive appearance and good playing quality, a teeing ground should have a smooth, uniform surface of closely mown turfgrass that exhibits good density and resilience. Although tees typically have a smooth and consistent grade following construction, uneven surface conditions develop over time due to divoting, improper divot repair and natural soil settling. Relevelling tees is typically necessary at five to seven year intervals, depending on play. Shorter intervals are sometimes required for par-3 tees and others that experience heavy traffic and divoting.
机译:对于有吸引力的外观和良好的竞争品质,Tieing地面应该具有光滑,均匀的表面,紧密割草,呈现出良好的密度和弹性。 尽管在施工后,T恤通常具有光滑且始终如一的级别,但由于缺乏划分,凹陷修复和天然土壤沉降而不均匀的表面条件随着时间的推移而发展。 相关的T恤通常需要五到七年间隔,具体取决于戏剧。 PAR-3 T恤和其他经历繁忙交通和分娩的其他人需要更短的间隔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号