...
首页> 外文期刊>Safety science >A practical tool for estimating compulsory OHS costs of residential building construction projects in Turkey
【24h】

A practical tool for estimating compulsory OHS costs of residential building construction projects in Turkey

机译:估算土耳其住宅楼宇建筑项目的强制性ohs成本的实用工具

获取原文
获取原文并翻译 | 示例
           

摘要

Construction industry is playing the most important role in the economic development not only in Turkey, but also in all developing countries. Turkish construction industry has reached its climax in the last 20 years with 7.4% share in total employment and 11.5% growth in terms of GNP in recent years. Parallel to this growth, there has been an increase in the number of occupational accidents in Turkish construction industry as well. Small or middle scale residential projects have a big share in the industry and majority of fatal accidents usually occur on such work sites. This study focuses on compulsory investments of small or middle scale residential building construction projects such as safety staffing costs on-site, formal safety training courses, PPE, safety facilities and fee for laboratory examinations in employment procedures of workers. Based on these subcomponents of OHS measures, an extensive literature review has been made to single out specific risks and the measures to prevent those risks. These specific parameters are then incorporated into an existing computer program, which had been originally designed to calculate direct construction costs only. By calculating and making a budget for the cost of prevention at the beginning of construction projects, it provides a better understanding of safety costs during a building construction project implementation. Thus, it helps efforts to reduce loss of workers' life and the mitigation of safety costs arising from severe injuries, fatalities, administrative procedures, legal obligations and litigation costs and expenses. The efficacy of the developed computer program is also tested on a construction project. The results reveal that the percentage of compulsory OHS costs to the direct construction costs is 5.15%, and OHS cost per unit area is approximately 8.47 USD/m(2).
机译:建筑业不仅在土耳其的经济发展中发挥最重要的作用,也在所有发展中国家。土耳其建筑业在过去的20年里达到了高潮,近年来总雇佣总额7.4%,而GNP的增长率为11.5%。与这种增长平行,土耳其建筑业职业事故的数量也在增加。中小型住宅项目在行业中有大量份额,大部分致命事故通常发生在此类工作场所。本研究重点介绍了小型或中型住宅建筑建设项目的强制投资,如安全人员在现场,正式安全培训课程,PPE,实验室检查中的实验室检查的安全设施和费用。根据这些of ohs措施的子组件,已经进行了广泛的文献综述,以单一特定的风险和防止这些风险的措施。然后将这些特定参数结合到现有的计算机程序中,该程序最初设计用于仅计算直接施工成本。通过计算和制定建筑项目开始时预防成本的预算,它可以更好地了解建筑建设项目实施期间的安全成本。因此,它有助于减少工人生命损失的努力以及严重伤害,死亡,行政程序,法律义务和诉讼成本和费用产生的安全成本。发达的计算机程序的功效也在建筑项目上进行了测试。结果表明,直接施工成本的强制性ohs成本的百分比为5.15%,每单位面积的ohs成本约为8.47美元/ m(2)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号