...
首页> 外文期刊>Foster Natural Gas Report >PURPA Final Rule Approved, Net Metering Petition Denied at FERC Meeting
【24h】

PURPA Final Rule Approved, Net Metering Petition Denied at FERC Meeting

机译:Purpa最终规则批准,净计量请愿书在FERC会议上拒绝

获取原文
获取原文并翻译 | 示例
           

摘要

A final rule to ease utility obligations associated with the Public Utility Regulatory Policies Act (PURPA), and the dismissal of a petition to undermine net metering were two major items FERC tackled at the July 16 open meeting. Both cases involve small renewable power projects, with solar and wind power trade commending the decision on net metering and examining the final rule on PURPA to assess the implications. The Solar Energy Industries Association (SEIA) didn't take long to comment that the PURPA changes will stifle the intention of the law and allow utilities to strengthen their monopolies. “We will continue advocating for reforms that strengthen PURPA and allow solar to compete nationwide,” said Katherine Gensler, vice president of regulatory affairs at SEIA.
机译:最终规则,以缓解与公用事业监管政策法案(PURPA)相关的公用事业义务,并解雇净计量的请愿书是FERC在7月16日公开会议上解决的两个主要项目。 这两种情况都涉及小型可再生能源项目,具有太阳能和风力贸易的贸易,请在净计量决定和检查PMPA上的最终规则以评估含义。 太阳能产业协会(SEIA)并不长时间评论,目的的变化将扼杀法律的意图,并允许公用事业能力加强垄断。 “我们将继续倡导加强Purpa并允许太阳能在全国范围内竞争的改革,”Seia监管事务副总裁Katherine Gensler说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号