...
首页> 外文期刊>European Planning Studies >Confronting institutional boundaries to public participation: a case of the Danish energy sector
【24h】

Confronting institutional boundaries to public participation: a case of the Danish energy sector

机译:对公众参与的制度界限面临建构的界限:丹麦能源部门的案例

获取原文
获取原文并翻译 | 示例
           

摘要

Although public participation has become an integrated part of planning practice, experience and documents literature still document difficulties in implementing participatory planning processes that provide arenas where citizens can truly influence planning. Based on a combination of institutional theory and action research methodology, this paper focuses on the institutional boundaries to introducing participatory practices by exploring openings and closures to the adoption of participatory planning processes by the Danish energy transmission system operator (TSO). Public participation in the Danish energy sector is characterized by complex institutional arrangements. The study shows how institutional boundaries are perceived by planners and how openings and closures can be identified and developed in an action research approach. The study reveals that citizen involvement has the potential to influence existing power structures but is highly challenged by an instrumentialised and sector-divided planning.
机译:虽然公众参与已成为规划实践的综合部分,但经验和文件文献仍在实施提供竞技场可以真正影响规划的参与式规划流程的困难。基于制度理论和行动研究方法的组合,本文侧重于制度界限,通过探索开放和关闭丹麦能源传输系统运营商(TSO)来引入参与式实践的制度范围。公众参与丹麦能源部门的特点是复杂的制度安排。该研究表明,规划者如何察觉制度范围以及如何在行动研究方法中确定和开辟开口和关闭方式。该研究表明,公民参与有可能影响现有的权力结构,但受到文书化和部门分割规划的强烈挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号